Skip to content
Al-Shaker for Scientific and Medical Supplies

GBC Cintra Performance Verification Kits

Certified test kits for verifying the performance of UV-Visible spectrometers: a NIST-traceable UV-Visible Reference Kit and a Neutral Density Filter Kit.

Key specifications

Contents
Seven sealed quartz cells with solutions
Checks
Photometric accuracy, wavelength accuracy, stray light and resolution
Traceability
NIST-traceable, supplied with certificate and report
Contents
Three filters (nominal 10%, 20% and 30% transmittance) plus a blank holder
  • Configured to your application by our specialists
  • Installed and commissioned on site
  • Training and after-sales support across Jordan, the GCC and MENA

Overview

Product overview

The UV-Visible Reference Kit has seven sealed quartz cells containing solutions for checking photometric accuracy, wavelength accuracy, stray light and resolution of any UV-Visible spectrometer. Standards are supplied with a certificate and a results report, and each cell is individually engraved with the certificate number.

The Neutral Density Filter Kit contains three filters of nominal 10%, 20% and 30% transmittance plus a blank holder, intended for long-term evaluation of photometric accuracy in quality control laboratories. GBC highlights use in pharmaceutical and ISO 9001-accredited laboratories.

Specifications

Technical specifications

4 parameters

UV-Visible Reference Kit

Contents
Seven sealed quartz cells with solutions
Checks
Photometric accuracy, wavelength accuracy, stray light and resolution
Traceability
NIST-traceable, supplied with certificate and report

Neutral Density Filter Kit

Contents
Three filters (nominal 10%, 20% and 30% transmittance) plus a blank holder
Features

Key features

  • 01

    UV-Visible Reference Kit

    Seven sealed quartz cells, NIST-traceable.

  • 02

    Certified and engraved

    Certificate and report supplied; each cell carries its certificate number.

  • 03

    Neutral Density Filter Kit

    10%, 20% and 30% filters plus a blank holder.

From order to operation

We stay with the instrument after it arrives

Al-Shaker specifies the configuration, documents the system, and supports it across Jordan, the GCC, and MENA.

  1. 01

    Consult

  2. 02

    Plan

  3. 03

    Supply

  4. 04

    Install

  5. 05

    Train

  6. 06

    Support

Talk to the technical team

Tell us the application. We will specify the system.

Share the workflow, capacity, and compliance constraints. We respond with a recommended configuration, not a generic catalogue list.