Skip to content
Al-Shaker for Scientific and Medical Supplies
Photos available on request

SUNDI W Explosion-Proof Chiller (-70 to 200 °C)

Explosion-proof dual-channel heater-chiller for hazardous areas, 11 to 50 kW of cooling and up to 50 kW of heating between -70 and 200 °C.

Key specifications

Medium temperature range
-25 to 200 / -45 to 200 / -70 to 200 °C
Medium temperature accuracy
±0.3 to ±0.5 °C
Heating power
38 / 38 / 50 kW
Cooling capacity at 20 °C
38 / 38 / 50 kW
  • Configured to your application by our specialists
  • Installed and commissioned on site
  • Training and after-sales support across Jordan, the GCC and MENA

Overview

Product overview

This SUNDI W variant adds explosion-proof measures so that the electrical equipment cannot ignite a surrounding flammable atmosphere, for petroleum, chemical and pharmaceutical sites. It has two independently controlled flow channels and an explosion-proof touch screen.

Models SUNDIW2-16W-2TExp, SUNDIW4-20W-2TExp and SUNDIW7-25WExp provide 38 to 50 kW of heating and up to 50 kW of cooling at 20 °C. Safety functions include centralized control, automatic ventilation, delayed power-on, pressure test with air replenishment and automatic power cut-off in danger.

Specifications

Technical specifications

9 parameters

Performance

Medium temperature range
-25 to 200 / -45 to 200 / -70 to 200 °C
Medium temperature accuracy
±0.3 to ±0.5 °C
Heating power
38 / 38 / 50 kW
Cooling capacity at 20 °C
38 / 38 / 50 kW
Cooling capacity at -15 °C
15 / 15 / 20 / 20 / 40 kW

Hydraulics

Max flow / pressure
250 L/min, 3 bar

Physical

Interface
DN50
Dimensions
250*200*220 cm
Weight
2500 to 2600 kg
Features

Key features

  • 01

    Explosion-proof design

    Built for flammable and explosive environments.

  • 02

    Two independent channels

    Each flow channel is controlled separately.

  • 03

    Safety sequence

    Automatic ventilation, delayed power-on and fault cut-off.

From order to operation

We stay with the instrument after it arrives

Al-Shaker specifies the configuration, documents the system, and supports it across Jordan, the GCC, and MENA.

  1. 01

    Consult

  2. 02

    Plan

  3. 03

    Supply

  4. 04

    Install

  5. 05

    Train

  6. 06

    Support

Talk to the technical team

Tell us the application. We will specify the system.

Share the workflow, capacity, and compliance constraints. We respond with a recommended configuration, not a generic catalogue list.