Skip to content
Al-Shaker for Scientific and Medical Supplies
1 / 2

Automatic Changeover - Mechanical / Electronic

Gas changeover manifold for two or more cylinders that switches from an empty to a standby cylinder without interrupting flow, up to 250 LPM at 6 bar.

Key specifications

Flow
250 LPM at 6 bar
Inlet
2 x 0-210 kg/cm2
Outlet
1 x 0-14 kg/cm2 (or as required)
Compatible gases
Air, N2, H2, He, acetylene, Ar, N2O, P10, other flammable / non-flammable / corrosive gases
  • Configured to your application by our specialists
  • Installed and commissioned on site
  • Training and after-sales support across Jordan, the GCC and MENA

Overview

Product overview

The automatic changeover system, in mechanical and electronic versions, switches from a depleted cylinder to a standby cylinder without any break in flow. The mechanical version suits two-cylinder systems and switches when pressure in the active cylinder falls below the set value; the set pressures can be adjusted to user requirements.

It can be used on multi-cylinder banks and handles air, N2, H2, He, acetylene, argon, N2O, P10 and other flammable, non-flammable and corrosive gases, at up to 250 LPM at 6 bar.

Specifications

Technical specifications

7 parameters

Performance

Flow
250 LPM at 6 bar

Pressure gauges

Inlet
2 x 0-210 kg/cm2
Outlet
1 x 0-14 kg/cm2 (or as required)

Gas service

Compatible gases
Air, N2, H2, He, acetylene, Ar, N2O, P10, other flammable / non-flammable / corrosive gases

Connections

Outlet
1/4 in OD ferrule fitting with ball valve
Inlet
1/4 in BSP male to suit cylinder pigtail

Dimensions

Mounting size
500 (L) x 300 (H) x 45 (D) mm
Features

Key features

  • 01

    Mechanical and electronic versions

  • 02

    No flow interruption

  • 03

    Suitable for corrosive and flammable gases

From order to operation

We stay with the instrument after it arrives

Al-Shaker specifies the configuration, documents the system, and supports it across Jordan, the GCC, and MENA.

  1. 01

    Consult

  2. 02

    Plan

  3. 03

    Supply

  4. 04

    Install

  5. 05

    Train

  6. 06

    Support

Talk to the technical team

Tell us the application. We will specify the system.

Share the workflow, capacity, and compliance constraints. We respond with a recommended configuration, not a generic catalogue list.