Skip to content
Al-Shaker for Scientific and Medical Supplies
1 / 2

Reference: RSSC-1 / DSSC-1 / DSSC-20

Empty Solid Phase Synthesis Columns

Empty solid phase synthesis columns with PE frits in five sizes (1, 3, 6, 12 and 20 mL), in rimmed and rimless designs; custom options are available.

Key specifications

RSSC-1
1 mL, with frits; 100 pcs/pack
RSSC-3
3 mL, with frits; 100 pcs/pack
RSSC-6
6 mL, with frits; 100 pcs/pack
RSSC-12
12 mL, with frits; 100 pcs/pack
  • Configured to your application by our specialists
  • Installed and commissioned on site
  • Training and after-sales support across Jordan, the GCC and MENA

Overview

Product overview

These empty solid phase synthesis columns are fitted with polyethylene frits and come in five sizes: 1 mL, 3 mL, 6 mL, 12 mL and 20 mL. Rimless (RSSC) and rimmed (DSSC) versions are listed.

Their application depends on the sorbent and frit chosen by the user, and Biocomma states that custom options are available.

Specifications

Technical specifications

11 parameters

Rimless columns

RSSC-1
1 mL, with frits; 100 pcs/pack
RSSC-3
3 mL, with frits; 100 pcs/pack
RSSC-6
6 mL, with frits; 100 pcs/pack
RSSC-12
12 mL, with frits; 100 pcs/pack

Rimmed columns

DSSC-1
1 mL, with frits; 100 pcs/pack
DSSC-3
3 mL, with frits; 100 pcs/pack
DSSC-6
6 mL, with frits; 100 pcs/pack
DSSC-12
12 mL, with frits; 100 pcs/pack
DSSC-20
20 mL, with frits; 50 pcs/pack

Materials

Frit material
Polyethylene (PE)

Sizes

Available volumes
1, 3, 6, 12 and 20 mL
Features

Key features

  • 01

    Five sizes

    1, 3, 6, 12 and 20 mL (the 20 mL size is supplied as rimmed columns).

  • 02

    Rimmed and rimless

    RSSC rimless and DSSC rimmed designs with frits already fitted.

  • 03

    Application set by the user

    Performance depends on the sorbent and frits selected.

  • 04

    Customisation

    Custom options are available on request.

From order to operation

We stay with the instrument after it arrives

Al-Shaker specifies the configuration, documents the system, and supports it across Jordan, the GCC, and MENA.

  1. 01

    Consult

  2. 02

    Plan

  3. 03

    Supply

  4. 04

    Install

  5. 05

    Train

  6. 06

    Support

Talk to the technical team

Tell us the application. We will specify the system.

Share the workflow, capacity, and compliance constraints. We respond with a recommended configuration, not a generic catalogue list.