Skip to content
Al-Shaker for Scientific and Medical Supplies

Reference: TJ040F

Soluble Ferric Pyrophosphate

Soluble ferric pyrophosphate supplement for BCYE Agar, used with L-Cysteine Hydrochloride for the isolation and cultivation of Legionella species.

Key specifications

Product code
TJ040F
Application
Isolation and cultivation of Legionella species
Preparation
Add one vial each of TJ039F and TJ040F to every 100 mL of BCYE Agar Base (GF1135F/KL1135F) to prepare BCYE Agar.
Soluble ferric pyrophosphate
25.0 mg/vial
  • Configured to your application by our specialists
  • Installed and commissioned on site
  • Training and after-sales support across Jordan, the GCC and MENA

Overview

Product overview

Soluble Ferric Pyrophosphate (TJ040F) is the second of the two supplements for BCYE Agar. One vial each of TJ039F (L-Cysteine Hydrochloride) and TJ040F is added to every 100 mL of BCYE Agar Base (GF1135F / KL1135F).

The prepared medium is used for the isolation and cultivation of Legionella species. Each vial contains 25.0 mg of soluble ferric pyrophosphate.

Specifications

Technical specifications

7 parameters

General

Product code
TJ040F
Application
Isolation and cultivation of Legionella species
Preparation
Add one vial each of TJ039F and TJ040F to every 100 mL of BCYE Agar Base (GF1135F/KL1135F) to prepare BCYE Agar.
Storage
Store in a dark and dry place at 2-8 °C.
Shelf life (sealed)
1 year
Precautions
Not for clinical use. Autoclave contaminated materials at 121 °C for 30 minutes before disposal.

Composition

Soluble ferric pyrophosphate
25.0 mg/vial
Features

Key features

  • 01

    Legionella cultivation

    Supports isolation and cultivation of Legionella species on BCYE Agar.

  • 02

    Two-vial set

    Used together with L-Cysteine Hydrochloride (TJ039F), one vial of each per 100 mL of base.

  • 03

    Defined content

    Each vial contains 25.0 mg soluble ferric pyrophosphate.

  • 04

    Storage

    Store in a dark, dry place at 2-8 °C; sealed shelf life is 1 year.

From order to operation

We stay with the instrument after it arrives

Al-Shaker specifies the configuration, documents the system, and supports it across Jordan, the GCC, and MENA.

  1. 01

    Consult

  2. 02

    Plan

  3. 03

    Supply

  4. 04

    Install

  5. 05

    Train

  6. 06

    Support

Talk to the technical team

Tell us the application. We will specify the system.

Share the workflow, capacity, and compliance constraints. We respond with a recommended configuration, not a generic catalogue list.