Skip to content
Al-Shaker for Scientific and Medical Supplies

Reference: Static Pass Box

Static Pass Box

Static pass box from Kesar for transferring materials between two areas of the same cleanliness class, with interlocked toughened glass doors and a UV lamp.

Key specifications

Material of construction
SS 304 / SS 316
Door type
Toughened glass
Interlock
Mechanical / electromagnetic
UV lamp
Provided
  • Configured to your application by our specialists
  • Installed and commissioned on site
  • Training and after-sales support across Jordan, the GCC and MENA

Overview

Product overview

The Kesar Static Pass Box is a transfer chamber for moving materials between two areas of the same cleanliness classification, reducing personnel movement and the risk of contamination.

The body is powder-coated steel or SS 304/316 with smooth edges for sanitising, toughened glass doors for visibility and a mechanical or electromagnetic door interlock. A UV germicidal lamp and LED door indicators are included.

It is designed to GMP principles and listed for pharmaceutical cleanrooms, microbiology laboratories, hospitals, food processing and electronics manufacturing.

Specifications

Technical specifications

5 parameters

Construction

Material of construction
SS 304 / SS 316
Door type
Toughened glass

Control

Interlock
Mechanical / electromagnetic

Sterilisation

UV lamp
Provided

Electrical

Power supply
Single phase 220-230 V, 50 Hz
Features

Key features

  • 01

    Door interlock

    Mechanical or electromagnetic interlock.

  • 02

    UV germicidal lamp

    Sterilisation of transferred items.

  • 03

    LED door indicator

    Shows door operation status.

  • 04

    Toughened glass doors

    Transparent doors for visibility.

  • 05

    Easy cleaning

    Smooth edges and stainless steel construction.

  • 06

    GMP compliant design

    Suited to cleanroom partitions.

From order to operation

We stay with the instrument after it arrives

Al-Shaker specifies the configuration, documents the system, and supports it across Jordan, the GCC, and MENA.

  1. 01

    Consult

  2. 02

    Plan

  3. 03

    Supply

  4. 04

    Install

  5. 05

    Train

  6. 06

    Support

Talk to the technical team

Tell us the application. We will specify the system.

Share the workflow, capacity, and compliance constraints. We respond with a recommended configuration, not a generic catalogue list.